Over Heat Safety Zone
OverHeat Safety Zone (Dump Zone): STRONGLY RECOMMENDED in all installations.
WhenthepelletboilerisoperatingatHighburn,andalldemandfromtheheatingsystemstops,the
controlwillreducethefeedrateandshutdowncompletelyasnecessary.Thismaytakeseveralminutes,
andtheremainingheatmaycausethewatertemperaturetocontinuetorise.Ifthetemperaturegetstoo
high,theOVERHEATSAFETYZONElightonthecontrol(seepage23)willilluminate,andtheDARK
BLUEcircuitinthejunctionboxisenergized(seewiringdiagram).Thiscircuitwillow120Vtooperatea
circulatorpumpinstalledtoowtotheoverheatdumpzoneestablishedintheoriginalinstallationplan.
Ifopeningazonevalveisthechosenmethodofdumpingtheexcessheat,avoltagereductionrelay
willmostlikelybeneeded.Ifthewatertemperaturecontinuestorisetotheriskofboilingpoint,thefeed
systemwillstopandtheboilerwillshut-down.Amanualresetwillthenberequiredtooperatetheboiler.
Withoutadumpzoneinplace,theexcesstemperaturecouldbuildpressuretothepointofopeningthe
reliefvalve,orwiththeatmosphericconversionitmayallowthewatertoboilandexitthroughtheover-
owoftheatmospherictank.Bothscenariosmaycreatewaterdamageand/orasliphazard.
Theboilingtemperatureofwatervaries atdifferentaltitudesandatmosphericpressures.Therefore,
atelevationsabove3000feet,andwhenusingtheatmosphericconversion,circuitboarddipswitch#6
mustbeinthe“ON”position.
MINIMUM OF 72" OF 3/4"
FINNED BASEBOARD
(HIGH TEMPERATURE) BASEBOARD HEAT
SYSTEM RETURN
SHUT-OFF VALVE
NOTE: ALWAYS REFER TO THE INDIVIDUAL COMPONENTS
RECOMMENDED INSTALLATION INSTRUCTIONS FOR THE PROPER
MOUNTING POSITION AND LOCATION WITHIN THE PIPING SYSTEM.
120VAC,NORMALLY OPEN,FULL FLOW,
SOLENOID VALVE or EQUIVALENT
THE SOLENOID SHOULD BE
POWERED BY THE SAME
CIRCUIT AS THE BOILER
BASEBOARD MUST BE AT LEAST
24" HIGHER THAN BOILER FOR
PROPER GRAVITY FLOW
UNION
BALANCING
VALVE
UNION
PIPE TO WITHIN
6" OF THE
FLOOR OR A
FLOOR DRAIN
* TEMPERATURE/PRESSURE GAUGE
* AQUASTAT WELL
* PRESSURE RELIEF VALVE
SHUT-OFF VALVE
* ITEMS SUPPLIED
POWER FAILURE SYSTEM SUPPLY 3/4"
SYSTEM SUPPLY
POWER FAILURE SYSTEM RETURN 3/4"
EXAMPLE OF PIPING IN ACCORDANCE
WITH (CAN/CSA-B366.1)
A POWER FAILURE HEAT DISSIPATION LOOP
Power Failure / Heat Dissipation Loop